This HVAC and piping project, in collaboration with the Federal Government, was a challenge on many levels. The assignment took place in Houston, Texas, and involved performing an upgrade of an existing battery backup system and the HVAC systems that condition the space. Restricted area clearance, along with elevated safety protocols, needed to be addressed daily. Throughout the project, our team overcame obstacles, not to mention the meticulous nature of the design and compact working conditions. The project was a success because of the due diligence and attention to detail maintained by our highly qualified team. Meeting every requirement along the way, our team exceeded customer expectations.
